The schedule of condition and why it protects you too

A schedule of condition is a dated record, in words and photographs, of the parts of the neighbour's property that could be affected by the work. It is often the most useful document in any later damage claim.

What it records

  • Existing cracks, with their length and position
  • Damp staining, loose plaster and uneven floors
  • The condition of decorations next to the shared wall
  • External walls, roofs, chimneys and garden walls near the work
  • Anything already defective before work starts

How it is done

The surveyor visits the neighbour's property, usually for under an hour on a domestic job, and takes notes and photographs. The record is then written up and attached to, or referred to in, the award.

Why building owners benefit

Without a schedule, a neighbour can claim that cracks which were already there were caused by your work. With one, everyone can see what was there before. It is protection for both sides.

When there is no award

Even where a neighbour consents and no award is made, it is sensible for the building owner to arrange a schedule of condition and send a copy to the neighbour. A modest fee now can avoid an expensive argument later.

After the work

At the end of the job, the surveyor can revisit and compare the property against the schedule. Any new damage is identified and dealt with under the award.